Concrete Pouring for Disabled Path to Toilet

Barrows poised at the ready, Rob gets the first barrow load.

Too much piled at the front of the barrow and it is spilling on the grass so dump it half way.
A good rythm going now as Nev roughly levels off the poured concrete.
Roughly filled, time to tamp level and smooth.
What are we going to do with all this left over concrete?
Barrow it down to Mac and strengthen the sides of the roadway
Hannah supervises the levelling of the road edge and smoothing of the path edge.
Finishing touches, gaurd posts planted so now it is time for a cuppa and a bacon butty.